Knowledge base

capacity_schedules verified

Warm-up schedule

A named schedule that raises limits over days; left empty on our nodes by decision.

In detail

The engine's own warm-up: a schedule with steps, each step attaching a throttle profile from a given day onward, with the profiles accumulating rather than replacing one another. Hub drives warm-up itself (DECISIONS § 61), so these tables stay empty — and a non-empty one on a node of ours means somebody is running a second warm-up the planner knows nothing about.